Installation
About
Implements the methods proposed by Olley, G.S. and Pakes, A. (1996) doi:10.2307/2171831, Levinsohn, J. and Petrin, A. (2003) doi:10.1111/1467-937X.00246, Ackerberg, D.A. and Caves, K. and Frazer, G. (2015) doi:10.3982/ECTA13408 and Wooldridge, J.M. (2009) doi:10.1016/j.econlet.2009.04.026 for structural productivity estimation .
Citation | prodest citation info |
github.com/GabrieleRovigatti/prodest/tree/master/prodest | |
Bug report | File report |
Key Metrics
Downloads
Yesterday | 10 0% |
Last 7 days | 57 -25% |
Last 30 days | 205 +9% |
Last 90 days | 529 -27% |
Last 365 days | 2.330 -28% |