CRAN/E | ProjectManagement

ProjectManagement

Management of Deterministic and Stochastic Projects

Installation

About

Management problems of deterministic and stochastic projects. It obtains the duration of a project and the appropriate slack for each activity in a deterministic context. In addition it obtains a schedule of activities' time (Castro, Gómez & Tejada (2007) doi:10.1016/j.orl.2007.01.003). It also allows the management of resources. When the project is done, and the actual duration for each activity is known, then it can know how long the project is delayed and make a fair delivery of the delay between each activity (Bergantiños, Valencia-Toledo & Vidal-Puga (2018) doi:10.1016/j.dam.2017.08.012). In a stochastic context it can estimate the average duration of the project and plot the density of this duration, as well as, the density of the early and last times of the chosen activities. As in the deterministic case, it can make a distribution of the delay generated by observing the project already carried out.

Key Metrics

Version 1.5.2
R ≥ 4.3.0
Published 2023-09-14 225 days ago
Needs compilation? no
License GPL-2
License GPL-3
CRAN checks ProjectManagement results

Downloads

Yesterday 16 0%
Last 7 days 56 -11%
Last 30 days 265 -20%
Last 90 days 903 -25%
Last 365 days 3.938 -12%

Maintainer

Maintainer

Juan Carlos Gonçalves Dosantos

juan.carlos.goncalves@udc.es

Authors

Juan Carlos Gonçalves Dosantos

aut / cre

Ignacio García Jurado

aut

Julián Costa Bouzas

aut

Material

Reference manual
Package source

macOS

r-release

arm64

r-oldrel

arm64

r-release

x86_64

r-oldrel

x86_64

Windows

r-devel

x86_64

r-release

x86_64

r-oldrel

x86_64

Old Sources

ProjectManagement archive

Depends

R ≥ 4.3.0
plotly

Imports

lpSolveAPI
triangle
kappalab
igraph